
Engineer - Generator Auxiliary Mechanical
GE Vernova · Posted Oct 15
Power generation, wind turbine, grid solution, and electrification services
Get a personal compatibility score
Add a resume for personal matches
About the role
The role sits within the CoE Large Generators organization at GE Vernova, working on Hydro power plant generators and their auxiliary systems in coordination with product definition, system integrators and suppliers. The work covers the mechanical design domain of generator auxiliaries such as braking, lifting, thrust bearing oil injection, oil mist and dust exhaust, fire fighting systems and air-water/oil-water coolers, including their piping layouts and technical specifications. This Engineer – Generator Auxiliaries Design position performs basic design and calculations, prepares P&IDs and specifications, manages work-packages and interfaces, and supports supply chain during execution.
What you will do
- Perform Basic Design & calculations, Prepare P&IDs, specification for Generator auxiliaries systems.
- Checking & release of final manufacturing & arrangement drawings including BoM received from Product definition or Suppliers
- To understand the specification of the project, product, customer requirement, Generator operating parameters and operating sequences of Hydro power plant
- Perform Basic Design and calculations for Generator auxiliary systems such as Braking, Lifting, Thrust bearing oil injection, Oil mist exhaust, Brake dust exhaust, Carbon dust exhaust, Fire fighting system, Air-water Coolers, Oil-water coolers for bearings, their piping’s layout.
- Coordinate and manage interface of Aux. system with Generator and other surrounding assemblies.
- Prepare technical specifications and drawings specifying design requirements
- Manage and execute work-packages with Product definition team
- Working with suppliers for defining, improving or cost out during design phase
- Support to Supply chain during execution phase
Skills used in this role
What the employer is looking for
- Educational Requirements: B. E. (Mechanical)
- At least 2 years in design of Auxiliary systems for Hydro Generator. Total experience desired > 3 years
- Experienced in understanding engineering requirements of Hydro Generator assemblies.
- Good understanding of Aux. system and components.
- Applied knowledge of Mechanical and Electrical engg, Piping & fittings standards, Heat exchangers
- Experienced in preparing design specifications for components mentioned in ‘responsibilities’
- Experienced in Design & Engineering Processes
- Good level in ‘MS Office” Application
- User Level SAP System, PLM (CORELLA)
- Experienced in CAD tools preferably AUTOCAD and UG NX
- Communication, Inter-personal relationship
- Pro-active & responsiveness
- To continuously manage and develop people
- To care for people
- Teamwork and accountability
- Communication / Transparency
Benefits and support
- Relocation Assistance Provided: Yes
About GE Vernova
GE Vernova Inc. is a global energy company that provides equipment, services, and software to generate, transfer, orchestrate, convert, and store electricity. Operating through its Power, Wind, and Electrification segments, the company supports a broad customer base across more than 100 countries in powering economies and driving the energy transition. Formed as part of the strategic spin-off of General Electric's energy portfolio, GE Vernova is dedicated to electrifying and decarbonizing the world.
- Industry
- Energy
- Company size
- 75000+ employees
- Founded
- 2024
- Location
- Cambridge, Massachusetts, USA
- Funding stage
- Public Company
Leadership
Chief Executive Officer and President
Stephen F. Angel
Chairman of the Board
Lola Lin
Chief Legal Officer and Secretary
Roger Martella
Chief Corporate Officer, Chief Sustainability Officer & Head of Global Government Affairs
Eric Gray
CEO, Power Segment
Recent coverage
GE Vernova News
GE Vernova to Double the Number of MIT Interns and Permanent Hires in 20272026-10-06
GE Vernova News
GE Vernova-powered projects receive 2026 POWER Magazine Awards for advancements in energy efficiency and decarbonization2026-10-05
GE Vernova News
GE Vernova declares fourth quarter 2026 dividend2026-09-30
GE Vernova News
GE Vernova Hitachi Nuclear Energy welcomes NRC issuance of construction permit for BWRX-300 SMR at TVA Clinch River site2026-09-29